Fast-Drying Screed at University Library, Birmingham

500m² fast-drying screed installation for Birmingham University Library, completed in just 5 days.

Start Your Project With Us

Project Overview

  • Location: Birmingham

  • Client Type: University (educational facility)

  • Project Size: 500m²

  • Screed Type: Fast-drying screed

  • Timeline: Completed in 5 days

  • Surface Regularity: SR1 (BS 8204)

close up of screed floor. showing the texture. close up.jpg
Our Solution 

Birmingham University required a durable and perfectly level floor for a major library renovation project. The site needed a solution that allowed for quick installation while achieving a high-quality finish. Our team installed 500m² of fast-drying screed, completed in just 5 days. The floor was laid to SR1 tolerance, ensuring a flawless surface ready for vinyl flooring installation.

Key Benefits

  • High-precision SR1 finish for library flooring
  • Completed within 5 days to meet academic deadlines
  • Fast-drying screed — walkable in 24 hours
  • Fully BS 8204 compliant installation

“Screeding.com worked professionally and efficiently throughout. The project was delivered to a very high standard and ahead of schedule, which was crucial for reopening the library.”
— Martin Keane, Estates Manager (University of Birmingham)

FAQ'S

Why was fast-drying screed used for this project?

It allowed the university to keep to its renovation schedule and ensured the library reopened on time.

What surface regularity was achieved?

The screed was laid to SR1 tolerance for a perfectly level surface.

How long before the library could reopen?

The screed was walkable within 24 hours, with final flooring installed shortly after.